Energy Minister Biraj Bhakta Shrestha and Finance Minister Dr. Swarnim Wagle have reached an in-principle agreement to remove VAT currently imposed on electricity consumption.
Following flood damage to the Trishuli and Chilime hydropower projects, the Nepal Electricity Authority (NEA) is preparing to supply 40 MW of electricity to Bangladesh from alternative projects in the Solu Corridor.
The Securities Board of Nepal (SEBON) has drafted new eligibility criteria for companies planning to issue Initial Public Offerings (IPOs), covering governance, financial strength, business readiness, disclosure, fund utilization, and sectoral risk.
The 22.50 MW Jaldigad Hydropower Project in Rukum West has secured total financing of Rs. 4.60 arba, including bank loans and promoter equity.
Gold prices declined by Rs. 1,300 per tola in the domestic market today, while silver prices recorded a slight increase.
Shine Resunga Development Bank Limited (SHINE) has scheduled its 18th Annual General Meeting (AGM) for Ashwin 28, 2083. The meeting will be held at Hotel Saffron C.K. Private Limited, Butwal, Rupandehi, starting at 11:30 AM.
Beni Hydropower’s IPO has been allotted through a lottery, with 86,320 applicants receiving 10 shares each.
Gandaki Province has submitted a 15-point climate agenda for Prime Minister Balendra Shah to raise at the 81st UN General Assembly, focusing on Himalayan climate finance, loss and damage, early warning systems, resilient infrastructure and mountain communities. PM Shah is scheduled to address the UN General Assembly on September 24.
Nepal’s year-on-year consumer inflation reached 5.96% in Shrawan 2083, the highest level in 21 months, driven mainly by rising food, oil, fruit and transportation prices.
Nepal exported 56.56 crore units of electricity to India and Bangladesh during Bhadra, generating more than Rs 5.09 billion in revenue.
Bhote Koshi flood has destroyed homes, land and businesses in Rasuwa and Nuwakot, leaving survivors struggling with bank and cooperative loans. Authorities are studying possible relief measures, including restructuring, rescheduling and loan write-offs in eligible cases.
The government has started printing driving licenses through the Electronic Driving License and Vehicle Registration System (EDLVRSS) from Shrawan 1 to make license printing and distribution faster and more efficient.